Inventory Reorder Point Calculator
Enter your average daily sales and supplier lead time, then choose a simple safety stock in days or one based on demand variability and service level. Add ordering and holding costs to get an economic order quantity.
Enter your numbers to see the result.
How to use this tool
- Enter average daily sales and the supplier's lead time in days.
- Choose a safety stock: days of cover, or a service level with the variability of daily sales.
- Optionally add current stock, order cost and holding cost.
Formulas and method
Z values: 90% = 1.2816, 95% = 1.6449, 97.5% = 1.9600, 99% = 2.3263 (standard normal distribution). The service-level method assumes daily demand is roughly normal and lead time is fixed.
Worked example
You sell 40 units a day, the supplier takes 7 days, and you keep 3 days of safety stock.
- Lead time demand = 280; safety stock = 120; reorder point = 400.
- With an order cost of 50 and a holding cost of 2 per unit per year: EOQ = √(2 × 14,600 × 50 ÷ 2) = 855 units, about 17 orders a year.
Limitations
- Assumes steady demand. Seasonal products need the inputs updated as the season changes.
- Supplier minimum order quantities and price breaks are not modelled.
Frequently asked questions
What is a reorder point?
The stock level at which you place a new order, so the delivery arrives before you run out, with a safety margin for slower deliveries or busier days.